Logo
Log In
Sign Up
NEWS FEED
RESOURCES
RESOURCES
calendar

EV Event calendar

presentation-chart

EV Sales tracker

currency-dollar

EV Promo Codes

chart-line

EV Stock Tracker

chart-bar-horizontal

EV industry M&A tracker

WIRE CATEGORIES
WIRE CATEGORIES

Chargingwire

Teslawire

Automakers

(coming soon)

Batterywire

Countries

(coming soon)

BECOME INSIDER
Logo

Tesla permit reveals 80 wireless Cybercab chargers at new Austin robotaxi hub

The permit says "robocar carwash and charging parking lot." That's a new one.

Simon Alvarez
Simon Alvarez

Aug 19, 2026

Tesla permit reveals 80 wireless Cybercab chargers at new Austin robotaxi hub

EVwire brief: Tesla is building a dedicated robotaxi charging and carwash facility in south Austin that includes plans for 80 wireless chargers for the Cybercab.

The project is planned at 405 E. St. Elmo Road, across from Tesla’s St. Elmo service center. The current permit documents show 48 V4 Supercharger stalls and 12 V3.5 Supercharger cabinets, while a second phase calls for two additional V4 charging cabinets capable of supporting 80 wireless chargers.

The filings were spotted by longtime Tesla Supercharger tracker MarcoRPi1, who noted that the site is being developed specifically as a Robotaxi fleet charging hub.

— # (#)

The full site plan for Tesla's St Elmo charging hub. The 82,107-square-foot lot is purpose-built for fleet operations. (Source)

The permit, filed under the project name "ST ELMO PARKING AND CHARGING" (TRT #20447), lists Tesla, Inc. as the tenant and ArcVision Inc. as the architect. The service description explicitly references "robocar" operations, a notable detail given that Tesla's Cybercab ride-hailing service in Austin is expected to launch as soon as this month.

Motorized gates, bollards, 11 new light poles, and a rain garden. No lounge, no retail. This site is built to move Robotaxis, not host road-trippers. (Source)

The plans also show the project's rather utilitarian approach. There is no elaborate customer lounge or retail building. The site is primarily a parking and charging facility, with the supporting electrical equipment, security infrastructure, and circulation improvements needed to keep Robotaxis moving.

The electrical layout. Phase 2's two V4 cabinets will power 80 wireless chargers, the first large-scale deployment of Tesla's Cybercab charging pad tech. (Source)

The site plan itself does not explicitly say that the 80 wireless chargers are for Cybercabs, and Tesla has not publicly announced the facility as a Cybercab charging hub. Still, the timing and design are difficult to ignore, especially since the Cybercab is the only Tesla vehicle that is expected to feature wireless charging as of writing.

Context:

The wireless charging component is the standout detail here. Tesla's recently published patents describe the technology behind the Cybercab's charging pad: a dual-voltage design supporting both 400V and 800V packs, and a dense sensor array with hundreds of bimetallic thermocouples for foreign-object detection. Eighty wireless stalls at a single site would be the first known large-scale deployment of this system.

The site also fits a pattern. Tesla recently filed plans for a 124-stall V4 Supercharger in San Francisco with similarly stripped-down amenities: two bathrooms, no lounge, no retail space. That filing prompted speculation that the site was designed for fleet vehicles rather than retail customers.

Source: @MarcoRPi1 on X (H/T @SawyerMerritt on X)

DIG DEEPER Read the full story and follow EVwire for more EV news. evwire.com — join 14,000+ EV geeks.

]]>

Thinking of getting an EV, selling yours, or need EV accessories and adapters?

Check out our fresh EVwire EV Deals page for the discounts we’ve gathered:

Explore EV Deals
arrow-circle-up-right

Are you a proper EV geek like us?

Then the EVwire Insider membership is for you.

Explore EVwire Insider
arrow-circle-up-right

Also find EVwire on these channels:

Keep Reading

Einride orders 500 Tesla Semis for Amazon and others in world's largest Semi deployment to date

Aug 18, 2026

•

2 min read

Einride orders 500 Tesla Semis for Amazon and others in world's largest Semi deployment to date

That's a lot of Semis.

Tesla will connect 250 blocked Supercharger stalls in Sweden, some have been ready since 2023

Aug 18, 2026

•

2 min read

Tesla will connect 250 blocked Supercharger stalls in Sweden, some have been ready since 2023

Tesla Sweden's fleet of "ghost stations" is finally waking up.

View more
caret-right

EVWire logo

News tips? news@evwire .com
Feedback? jaan@evwire .com

Get our value-packed weekly EV newsletters:

Looking for something specific?

EV Stock Tracker EV Sales Tracker EV Events Calendar EV Funding Tracker EV Promo Codes EVwire Feed EVwire Insider Hub